{"id":1526,"date":"2025-06-14T15:03:41","date_gmt":"2025-06-14T07:03:41","guid":{"rendered":"https:\/\/www.evaisun.com\/?p=1526"},"modified":"2025-06-14T15:03:43","modified_gmt":"2025-06-14T07:03:43","slug":"top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure","status":"publish","type":"post","link":"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/","title":{"rendered":"Top Mistakes to Avoid When Scaling EV Fleet Charging Infrastructure"},"content":{"rendered":"\n<p>As electric vehicles (EVs) rapidly gain popularity worldwide, more fleets are accelerating their transition to electric mobility. To ensure efficient fleet operations, properly planning and scaling charging infrastructure is critical. However, fleet managers often encounter common pitfalls during construction and expansion, resulting in limited charging network performance, increased operational costs, and sometimes compromised service quality. <\/p>\n\n\n\n<p>This article dives into six major mistakes to avoid, helping you build scalable and reliable charging infrastructure.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Mistake 1: Underestimating Future Fleet Growth<\/strong><\/h2>\n\n\n\n<p>Many fleets focus only on current needs during initial planning, overlooking future growth in fleet size and vehicle diversity. As the number of EVs increases and models evolve, charging demand will grow significantly. Without reserving space and power capacity for expansion early on, scaling later can become costly, complicated, and disruptive to daily operations.<\/p>\n\n\n\n<p><strong>Solutions:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Design with ample electrical capacity and physical space for future charger additions.<\/li>\n\n\n\n<li>Choose chargers that support multiple power levels to accommodate various vehicle types and charging needs.<\/li>\n\n\n\n<li>Prioritize modular systems to enable phased expansion and spread capital expenses over time.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Mistake 2: Ignoring Modular and Scalable Design<\/h2>\n\n\n\n<p>Traditional charging stations built all at once often lack the flexibility to keep up with rapidly changing technology and evolving fleet needs. Modular design, on the other hand, allows fleets to adjust and expand their charging infrastructure as needed, quickly responding to changes in fleet size while minimizing maintenance and upgrade risks.<\/p>\n\n\n\n<p>Modular solutions typically offer several advantages:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Gradual expansion with phased investments to ease financial pressure<\/li>\n\n\n\n<li>Reduced downtime to ensure continuous charging availability<\/li>\n\n\n\n<li>Support for multi-site coordinated management to optimize overall load<\/li>\n<\/ul>\n\n\n\n<p>In fact, more and more fleets are adopting modular and scalable charging solutions as a smart approach to <a href=\"https:\/\/www.evaisun.com\/best-scalable-ev-charging-infrastructure-options-for-fleets\/\">scaling EV fleet charging infrastructure<\/a>. This strategy not only boosts operational efficiency but also prepares fleets for future technology upgrades and growth.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Mistake 3: Overlooking Smart Communication and Load Management<\/strong><\/h2>\n\n\n\n<p>Smart communication and load management technologies play a crucial role in modern charging infrastructure. Without effective load balancing, charging systems can experience peak power demand spikes, leading to higher electricity costs or grid stress.<\/p>\n\n\n\n<p><strong>Key features include:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Real-time coordination between chargers via CAN communication protocols.<\/li>\n\n\n\n<li>Dynamic power allocation to prevent multiple high-power chargers from operating simultaneously and overloading the grid.<\/li>\n\n\n\n<li>Remote monitoring and fault diagnostics to improve maintenance efficiency and reduce unexpected downtime.<\/li>\n<\/ul>\n\n\n\n<p>Intelligent management not only boosts charging efficiency but also lowers operating costs and ensures network stability.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Vehicle-Charging-Station-Site-Selection_PhotoGrid-1024x576.png\" alt=\"\" class=\"wp-image-1536\" srcset=\"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Vehicle-Charging-Station-Site-Selection_PhotoGrid-1024x576.png 1024w, https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Vehicle-Charging-Station-Site-Selection_PhotoGrid-300x169.png 300w, https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Vehicle-Charging-Station-Site-Selection_PhotoGrid-500x281.png 500w, https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Vehicle-Charging-Station-Site-Selection_PhotoGrid-1536x863.png 1536w, https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Vehicle-Charging-Station-Site-Selection_PhotoGrid-2048x1151.png 2048w, https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Vehicle-Charging-Station-Site-Selection_PhotoGrid-1920x1080.png 1920w, https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Vehicle-Charging-Station-Site-Selection_PhotoGrid-800x450.png 800w, https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Vehicle-Charging-Station-Site-Selection_PhotoGrid-1000x562.png 1000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Mistake 4: Neglecting Site and Grid Conditions<\/strong><\/h2>\n\n\n\n<p>Site selection and grid conditions are critical to system stability and safety. Ignoring grid capacity limits, ventilation, or harsh environmental factors can degrade equipment performance or cause failures.<\/p>\n\n\n\n<p><strong>Important considerations:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Assess grid capacity and determine if substation upgrades are needed.<\/li>\n\n\n\n<li>Ensure indoor\/outdoor suitability, including dust and water protection ratings and temperature tolerances.<\/li>\n\n\n\n<li>Optimize charger layout to maintain proper ventilation and safety access.<\/li>\n<\/ul>\n\n\n\n<p>Thorough site evaluation extends equipment lifespan and reduces maintenance needs.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Mistake 5: Disregarding Charging Standard Compatibility<\/strong><\/h2>\n\n\n\n<p>Charging protocols vary by region and vehicle type, including GB\/T (China), CCS2 (Europe &amp; US), and CHAdeMO. Overlooking compatibility risks making equipment unusable for future vehicles, limiting fleet flexibility.<\/p>\n\n\n\n<p>Also, make sure chargers meet safety certifications like CE and UL. Compliance ensures safe operation, longer equipment life, and reliable after-sales support.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Mistake 6: Lacking Systematic Maintenance and Remote Management<\/strong><\/h2>\n\n\n\n<p>Long-term reliability depends on effective maintenance management. Without remote monitoring and data analytics, fleets struggle to anticipate failures, leading to higher costs and slow response times.<\/p>\n\n\n\n<p><strong>Recommended practices:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Use remote management platforms to monitor charger status in real time.<\/li>\n\n\n\n<li>Leverage data analytics to predict and prevent potential issues.<\/li>\n\n\n\n<li>Establish regular maintenance schedules to extend equipment lifespan.<\/li>\n<\/ul>\n\n\n\n<p>Smart maintenance dramatically improves fleet charging reliability and operational efficiency.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Summary: Key Takeaways for Scalable EV Fleet Charging Infrastructure<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Common Mistake<\/th><th>Key Solution<\/th><th>Benefit<\/th><\/tr><\/thead><tbody><tr><td>Underestimating fleet growth<\/td><td>Plan for flexible expansion<\/td><td>Avoid costly retrofits<\/td><\/tr><tr><td>Ignoring modular design<\/td><td>Adopt modular, scalable systems<\/td><td>Lower risk, easier upgrades<\/td><\/tr><tr><td>Overlooking load management<\/td><td>Implement smart load balancing<\/td><td>Reduce peak charges, protect grid<\/td><\/tr><tr><td>Neglecting site conditions<\/td><td>Conduct thorough site assessments<\/td><td>Improve safety, reduce failures<\/td><\/tr><tr><td>Disregarding standards<\/td><td>Ensure multi-protocol support<\/td><td>Maximize compatibility<\/td><\/tr><tr><td>Lacking systematic maintenance<\/td><td>Use remote monitoring &amp; analytics<\/td><td>Increase uptime, reduce costs<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Conclusion<\/strong><\/h2>\n\n\n\n<p>Successfully scaling <a href=\"https:\/\/www.evaisun.com\/fleet-charging-stations\/\">EV fleet charging infrastructure<\/a> starts with avoiding the most common mistakes\u2014underestimating growth, overlooking modular design, and failing to plan for smart energy management. These missteps can lead to costly upgrades, operational downtime, and reduced system efficiency.<\/p>\n\n\n\n<p>To build a future-ready charging network, fleet operators should prioritize scalable architecture, cross-standard compatibility, and intelligent monitoring systems. With thoughtful planning, your charging infrastructure can support long-term expansion while maintaining performance, reliability, and cost-effectiveness.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As more fleets transition to electric vehicles, charging infrastructure must scale efficiently. This guide explores six common mistakes to avoid and offers practical solutions to ensure reliable and future-ready fleet charging networks.<\/p>\n","protected":false},"author":5,"featured_media":1538,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"yoast_wpseo_title":"","yoast_wpseo_metadesc":"","footnotes":""},"categories":[12],"tags":[54],"class_list":["post-1526","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-guidelines","tag-ev-fleet-charging-infrastructure"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Avoid These Costly Pitfalls in EV Fleet Charging Expansion<\/title>\n<meta name=\"description\" content=\"Avoid costly missteps when planning EV fleet charging infrastructure. Learn key strategies for scalable, reliable, and future-proof EV charging systems.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Avoid These Costly Pitfalls in EV Fleet Charging Expansion\" \/>\n<meta property=\"og:description\" content=\"Avoid costly missteps when planning EV fleet charging infrastructure. Learn key strategies for scalable, reliable, and future-proof EV charging systems.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/\" \/>\n<meta property=\"og:site_name\" content=\"AiPower\" \/>\n<meta property=\"article:published_time\" content=\"2025-06-14T07:03:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-14T07:03:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/ev-fleet-charging-infrastructure-mistakes_PhotoGrid-1024x576.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"suike\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"suike\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/\",\"url\":\"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/\",\"name\":\"Avoid These Costly Pitfalls in EV Fleet Charging Expansion\",\"isPartOf\":{\"@id\":\"https:\/\/www.evaisun.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/ev-fleet-charging-infrastructure-mistakes_PhotoGrid-scaled.png\",\"datePublished\":\"2025-06-14T07:03:41+00:00\",\"dateModified\":\"2025-06-14T07:03:43+00:00\",\"author\":{\"@id\":\"https:\/\/www.evaisun.com\/#\/schema\/person\/286d9005918799e039a14fac9f7ef9d3\"},\"description\":\"Avoid costly missteps when planning EV fleet charging infrastructure. Learn key strategies for scalable, reliable, and future-proof EV charging systems.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/#primaryimage\",\"url\":\"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/ev-fleet-charging-infrastructure-mistakes_PhotoGrid-scaled.png\",\"contentUrl\":\"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/ev-fleet-charging-infrastructure-mistakes_PhotoGrid-scaled.png\",\"width\":2560,\"height\":1439},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.evaisun.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Guidelines\",\"item\":\"https:\/\/www.evaisun.com\/category\/guidelines\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Top Mistakes to Avoid When Scaling EV Fleet Charging Infrastructure\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.evaisun.com\/#website\",\"url\":\"https:\/\/www.evaisun.com\/\",\"name\":\"AiPower\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.evaisun.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.evaisun.com\/#\/schema\/person\/286d9005918799e039a14fac9f7ef9d3\",\"name\":\"suike\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Avoid These Costly Pitfalls in EV Fleet Charging Expansion","description":"Avoid costly missteps when planning EV fleet charging infrastructure. Learn key strategies for scalable, reliable, and future-proof EV charging systems.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/","og_locale":"en_US","og_type":"article","og_title":"Avoid These Costly Pitfalls in EV Fleet Charging Expansion","og_description":"Avoid costly missteps when planning EV fleet charging infrastructure. Learn key strategies for scalable, reliable, and future-proof EV charging systems.","og_url":"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/","og_site_name":"AiPower","article_published_time":"2025-06-14T07:03:41+00:00","article_modified_time":"2025-06-14T07:03:43+00:00","og_image":[{"width":1024,"height":576,"url":"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/ev-fleet-charging-infrastructure-mistakes_PhotoGrid-1024x576.png","type":"image\/png"}],"author":"suike","twitter_card":"summary_large_image","twitter_misc":{"Written by":"suike","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/","url":"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/","name":"Avoid These Costly Pitfalls in EV Fleet Charging Expansion","isPartOf":{"@id":"https:\/\/www.evaisun.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/#primaryimage"},"image":{"@id":"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/#primaryimage"},"thumbnailUrl":"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/ev-fleet-charging-infrastructure-mistakes_PhotoGrid-scaled.png","datePublished":"2025-06-14T07:03:41+00:00","dateModified":"2025-06-14T07:03:43+00:00","author":{"@id":"https:\/\/www.evaisun.com\/#\/schema\/person\/286d9005918799e039a14fac9f7ef9d3"},"description":"Avoid costly missteps when planning EV fleet charging infrastructure. Learn key strategies for scalable, reliable, and future-proof EV charging systems.","breadcrumb":{"@id":"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/#primaryimage","url":"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/ev-fleet-charging-infrastructure-mistakes_PhotoGrid-scaled.png","contentUrl":"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/ev-fleet-charging-infrastructure-mistakes_PhotoGrid-scaled.png","width":2560,"height":1439},{"@type":"BreadcrumbList","@id":"https:\/\/www.evaisun.com\/top-mistakes-to-avoid-when-scaling-ev-fleet-charging-infrastructure\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.evaisun.com\/"},{"@type":"ListItem","position":2,"name":"Guidelines","item":"https:\/\/www.evaisun.com\/category\/guidelines\/"},{"@type":"ListItem","position":3,"name":"Top Mistakes to Avoid When Scaling EV Fleet Charging Infrastructure"}]},{"@type":"WebSite","@id":"https:\/\/www.evaisun.com\/#website","url":"https:\/\/www.evaisun.com\/","name":"AiPower","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.evaisun.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.evaisun.com\/#\/schema\/person\/286d9005918799e039a14fac9f7ef9d3","name":"suike"}]}},"_links":{"self":[{"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/posts\/1526","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/comments?post=1526"}],"version-history":[{"count":8,"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/posts\/1526\/revisions"}],"predecessor-version":[{"id":1537,"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/posts\/1526\/revisions\/1537"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/media\/1538"}],"wp:attachment":[{"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/media?parent=1526"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/categories?post=1526"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/tags?post=1526"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}