{"id":1571,"date":"2025-06-23T17:19:57","date_gmt":"2025-06-23T09:19:57","guid":{"rendered":"https:\/\/www.evaisun.com\/?p=1571"},"modified":"2025-06-23T17:19:59","modified_gmt":"2025-06-23T09:19:59","slug":"electric-bus-charging-explained-key-concepts-and-infrastructure-essentials","status":"publish","type":"post","link":"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/","title":{"rendered":"Electric Bus Charging Explained: Key Concepts and Infrastructure Essentials"},"content":{"rendered":"\n<p>The global shift toward sustainable public transit is accelerating, with electric buses (e-buses) at the forefront. Known for their zero tailpipe emissions and quiet operation, e-buses are reshaping urban mobility. Yet, their success hinges on one critical factor: the availability of efficient, intelligent infrastructure for charging electric buses.<\/p>\n\n\n\n<p>This guide unpacks the core principles of charging electric buses, offering fleet operators, transit planners, and energy stakeholders a practical foundation for informed decisions.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Why Charging Infrastructure Is Crucial<\/strong><\/h2>\n\n\n\n<p>Unlike private EVs, electric buses follow high-mileage, time-sensitive routes and must maintain predictable service schedules. Inadequate capacity for charging buses can lead to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Increased downtime and reduced fleet availability<\/li>\n\n\n\n<li>Range anxiety limiting route flexibility<\/li>\n\n\n\n<li>Inefficiencies that inflate operating costs<\/li>\n\n\n\n<li>Accelerated battery wear from poor charging practices<\/li>\n<\/ul>\n\n\n\n<p>Strategic infrastructure planning directly impacts uptime, route optimization, and total cost of ownership (TCO).<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>AC vs. DC Charging: Understanding the Basics<\/strong><\/h2>\n\n\n\n<p>When it comes to charging electric buses, there are two main methods to consider:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Feature<\/th><th>AC Charging<\/th><th>DC Fast Charging<\/th><\/tr><\/thead><tbody><tr><td>Conversion Method<\/td><td>Onboard charger converts AC to DC<\/td><td>External unit delivers DC directly<\/td><\/tr><tr><td>Charging Speed<\/td><td>Slower (6-12 hours)<\/td><td>Rapid (minutes to a few hours)<\/td><\/tr><tr><td>Typical Use Case<\/td><td>Overnight depot charging<\/td><td>Quick top-ups at terminals or on-route<\/td><\/tr><tr><td>Power Range<\/td><td>22 kW \u2013 100 kW<\/td><td>150 kW \u2013 600+ kW<\/td><\/tr><tr><td>Installation Cost<\/td><td>Lower<\/td><td>Higher; requires stronger grid connection<\/td><\/tr><tr><td>Best For<\/td><td>Central depots, fixed schedules<\/td><td>High-frequency routes, tight turnarounds<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Charging Power Levels and Use Cases<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Charging Category<\/th><th>Power Output<\/th><th>Charging Duration<\/th><th>Suitable Scenarios<\/th><\/tr><\/thead><tbody><tr><td>Standard (AC)<\/td><td>22 kW \u2013 100 kW<\/td><td>6-12 hours<\/td><td>Depot overnight charging<\/td><\/tr><tr><td>Fast (DC)<\/td><td>150 kW \u2013 350 kW<\/td><td>1-3 hours<\/td><td>Depot top-ups, off-peak midday breaks<\/td><\/tr><tr><td>Ultra-Fast (DC)<\/td><td>350 kW \u2013 600+ kW<\/td><td>10-30 minutes<\/td><td>Opportunity charging at route endpoints<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<aside class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p>Note: Even with ultra-fast chargers, actual charge rates are limited by the bus battery&#8217;s maximum C-rate (charging speed relative to battery size).<\/p>\n<\/div><\/aside>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Battery Chemistry and Charging Dynamics<\/strong><\/h2>\n\n\n\n<p>E-bus battery design plays a significant role in defining charging strategies:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Chemistry:<\/strong> LFP (LiFePO4) batteries dominate due to their thermal stability, long cycle life, and safety. However, some operators use NMC batteries for longer-range applications.<\/li>\n\n\n\n<li><strong>State of Charge (SoC):<\/strong> Optimal fast-charging occurs between 20% and 80%. Above 80%, charging slows to preserve battery health.<\/li>\n\n\n\n<li><strong>Battery Management System (BMS):<\/strong> Regulates current, temperature, and safety parameters. Chargers must be compatible with the BMS.<\/li>\n\n\n\n<li><strong>Thermal Management:<\/strong> Liquid cooling is essential to prevent overheating during high-power charging.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Bus-Charging-Stations-1-1024x576.png\" alt=\"\" class=\"wp-image-1588\" srcset=\"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Bus-Charging-Stations-1-1024x576.png 1024w, https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Bus-Charging-Stations-1-300x169.png 300w, https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Bus-Charging-Stations-1-500x281.png 500w, https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Bus-Charging-Stations-1-1536x864.png 1536w, https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Bus-Charging-Stations-1-2048x1152.png 2048w, https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Bus-Charging-Stations-1-1920x1080.png 1920w, https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Bus-Charging-Stations-1-800x450.png 800w, https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Bus-Charging-Stations-1-1000x563.png 1000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Infrastructure Deployment Strategies<\/strong><\/h2>\n\n\n\n<p>Charging strategy depends on route design, fleet size, and depot access:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Strategy<\/th><th>Description<\/th><th>Best For<\/th><th>Challenges<\/th><\/tr><\/thead><tbody><tr><td>Depot Charging<\/td><td>Overnight charging at a central location<\/td><td>Fleets with predictable schedules<\/td><td>Space needs, power upgrades<\/td><\/tr><tr><td>Opportunity Charging<\/td><td>Mid-route top-ups during layovers<\/td><td>High-utilization, short-range batteries<\/td><td>Timing, equipment cost<\/td><\/tr><tr><td>Endpoint Charging<\/td><td>Charging only at terminals<\/td><td>Linear routes with regular layovers<\/td><td>Limited by turnaround duration<\/td><\/tr><tr><td>On-Route Charging<\/td><td>Installed at intermediate stops<\/td><td>Long or variable routes<\/td><td>Engineering complexity, traffic impacts<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Power Infrastructure and Grid Readiness<\/strong><\/h2>\n\n\n\n<p>High-power charging solutions for electric buses demand careful grid planning:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Grid Capacity:<\/strong> May require substation upgrades or dedicated feeders<\/li>\n\n\n\n<li><strong>Load Management:<\/strong> Smart systems balance loads to avoid peak demand surges<\/li>\n\n\n\n<li><strong>High-Voltage Access:<\/strong> 11-33kV feeds needed for large installations<\/li>\n\n\n\n<li><strong>Cabling Solutions:<\/strong> Retractable reels or pantographs improve ergonomics and uptime<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Overcoming Installation Challenges<\/strong><\/h2>\n\n\n\n<p>Implementing charging bus stations involves multiple steps:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Site Assessment:<\/strong> Evaluate space, power access, traffic flow, and safety<\/li>\n\n\n\n<li><strong>Civil Engineering:<\/strong> Install foundations, electrical trenching, and protective structures<\/li>\n\n\n\n<li><strong>Permitting:<\/strong> Align with utility and municipal regulations<\/li>\n\n\n\n<li><strong>Upfront Investment:<\/strong> Significant initial cost, but lower TCO compared to diesel over time<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>The Role of Smart Charging Systems<\/strong><\/h2>\n\n\n\n<p>Software-enabled systems bring intelligence and efficiency to charging electric buses:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Load Balancing:<\/strong> Distributes energy across multiple chargers to prevent overloads<\/li>\n\n\n\n<li><strong>Time-of-Use Optimization:<\/strong> Charges buses during off-peak hours to reduce cost<\/li>\n\n\n\n<li><strong>Remote Monitoring:<\/strong> Tracks charger health, energy usage, and maintenance needs<\/li>\n\n\n\n<li><strong>Fleet Integration:<\/strong> Interfaces with scheduling software to align charging with operations<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Emerging Technologies and Trends<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Technology<\/th><th>Potential Benefit<\/th><th>Status<\/th><\/tr><\/thead><tbody><tr><td>Pantograph Charging<\/td><td>Automated high-speed charging<\/td><td>Widely deployed in Europe and China<\/td><\/tr><tr><td>Wireless Charging<\/td><td>Cable-free charging at depots\/stops<\/td><td>Pilot projects; limited efficiency<\/td><\/tr><tr><td>Vehicle-to-Grid (V2G)<\/td><td>Buses act as energy storage for the grid<\/td><td>Early-stage; needs regulatory framework<\/td><\/tr><tr><td>Battery Swapping<\/td><td>Fast exchange removes charging downtime<\/td><td>Niche deployments; standardization issues<\/td><\/tr><tr><td>Solid-State Batteries<\/td><td>Faster, safer, higher energy density<\/td><td>Lab testing; commercial in 5-10 years<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<aside class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p>Note: While promising, technologies like V2G and battery swapping still face technical and economic hurdles, including battery degradation and interoperability concerns.<\/p>\n<\/div><\/aside>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Conclusion: Building the Backbone of Green Transit<\/strong><\/h2>\n\n\n\n<p>Electric buses are a cornerstone of sustainable urban transport, but their full potential depends on smart, scalable solutions for <a href=\"https:\/\/www.evaisun.com\/electric-bus-charging-stations\/\">charging electric buses<\/a>. By understanding the fundamentals\u2014from power levels and battery dynamics to deployment models and smart software\u2014operators can make informed decisions that reduce costs and ensure reliable service.<\/p>\n\n\n\n<p>Long-term success requires planning, investment, and coordination between transit agencies, utilities, and infrastructure providers. As technology advances, future-ready solutions like pantograph systems and smart energy management will only grow in importance.<\/p>\n\n\n\n<p>In the journey toward decarbonized public transit, charging buses efficiently and intelligently is not a secondary concern\u2014it&#8217;s the foundation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Electric buses are reshaping public transit with cleaner, quieter operations\u2014but their success relies on efficient charging infrastructure. This guide breaks down the core elements of charging electric buses, including AC\/DC systems, battery chemistry, grid readiness, and smart technologies. Learn how to deploy reliable, future-ready solutions for your e-bus fleet.<\/p>\n","protected":false},"author":5,"featured_media":1592,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"yoast_wpseo_title":"","yoast_wpseo_metadesc":"","footnotes":""},"categories":[12],"tags":[58],"class_list":["post-1571","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-guidelines","tag-charging-electric-buses"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Charging Electric Buses: Essential Guide to Infrastructure and Strate<\/title>\n<meta name=\"description\" content=\"Discover key concepts of charging electric buses\u2014from AC\/DC types and battery strategies to smart grid integration and future technologies.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Charging Electric Buses: Essential Guide to Infrastructure and Strate\" \/>\n<meta property=\"og:description\" content=\"Discover key concepts of charging electric buses\u2014from AC\/DC types and battery strategies to smart grid integration and future technologies.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/\" \/>\n<meta property=\"og:site_name\" content=\"AiPower\" \/>\n<meta property=\"article:published_time\" content=\"2025-06-23T09:19:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-23T09:19:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Bus-Charging-Stations-2-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"864\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"suike\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"suike\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/\",\"url\":\"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/\",\"name\":\"Charging Electric Buses: Essential Guide to Infrastructure and Strate\",\"isPartOf\":{\"@id\":\"https:\/\/www.evaisun.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Bus-Charging-Stations-2-1.png\",\"datePublished\":\"2025-06-23T09:19:57+00:00\",\"dateModified\":\"2025-06-23T09:19:59+00:00\",\"author\":{\"@id\":\"https:\/\/www.evaisun.com\/#\/schema\/person\/286d9005918799e039a14fac9f7ef9d3\"},\"description\":\"Discover key concepts of charging electric buses\u2014from AC\/DC types and battery strategies to smart grid integration and future technologies.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/#primaryimage\",\"url\":\"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Bus-Charging-Stations-2-1.png\",\"contentUrl\":\"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Bus-Charging-Stations-2-1.png\",\"width\":1536,\"height\":864},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.evaisun.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Guidelines\",\"item\":\"https:\/\/www.evaisun.com\/category\/guidelines\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Electric Bus Charging Explained: Key Concepts and Infrastructure Essentials\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.evaisun.com\/#website\",\"url\":\"https:\/\/www.evaisun.com\/\",\"name\":\"AiPower\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.evaisun.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.evaisun.com\/#\/schema\/person\/286d9005918799e039a14fac9f7ef9d3\",\"name\":\"suike\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Charging Electric Buses: Essential Guide to Infrastructure and Strate","description":"Discover key concepts of charging electric buses\u2014from AC\/DC types and battery strategies to smart grid integration and future technologies.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/","og_locale":"en_US","og_type":"article","og_title":"Charging Electric Buses: Essential Guide to Infrastructure and Strate","og_description":"Discover key concepts of charging electric buses\u2014from AC\/DC types and battery strategies to smart grid integration and future technologies.","og_url":"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/","og_site_name":"AiPower","article_published_time":"2025-06-23T09:19:57+00:00","article_modified_time":"2025-06-23T09:19:59+00:00","og_image":[{"width":1536,"height":864,"url":"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Bus-Charging-Stations-2-1.png","type":"image\/png"}],"author":"suike","twitter_card":"summary_large_image","twitter_misc":{"Written by":"suike","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/","url":"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/","name":"Charging Electric Buses: Essential Guide to Infrastructure and Strate","isPartOf":{"@id":"https:\/\/www.evaisun.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/#primaryimage"},"image":{"@id":"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/#primaryimage"},"thumbnailUrl":"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Bus-Charging-Stations-2-1.png","datePublished":"2025-06-23T09:19:57+00:00","dateModified":"2025-06-23T09:19:59+00:00","author":{"@id":"https:\/\/www.evaisun.com\/#\/schema\/person\/286d9005918799e039a14fac9f7ef9d3"},"description":"Discover key concepts of charging electric buses\u2014from AC\/DC types and battery strategies to smart grid integration and future technologies.","breadcrumb":{"@id":"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/#primaryimage","url":"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Bus-Charging-Stations-2-1.png","contentUrl":"https:\/\/www.evaisun.com\/wp-content\/uploads\/2025\/06\/Electric-Bus-Charging-Stations-2-1.png","width":1536,"height":864},{"@type":"BreadcrumbList","@id":"https:\/\/www.evaisun.com\/electric-bus-charging-explained-key-concepts-and-infrastructure-essentials\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.evaisun.com\/"},{"@type":"ListItem","position":2,"name":"Guidelines","item":"https:\/\/www.evaisun.com\/category\/guidelines\/"},{"@type":"ListItem","position":3,"name":"Electric Bus Charging Explained: Key Concepts and Infrastructure Essentials"}]},{"@type":"WebSite","@id":"https:\/\/www.evaisun.com\/#website","url":"https:\/\/www.evaisun.com\/","name":"AiPower","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.evaisun.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.evaisun.com\/#\/schema\/person\/286d9005918799e039a14fac9f7ef9d3","name":"suike"}]}},"_links":{"self":[{"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/posts\/1571","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/comments?post=1571"}],"version-history":[{"count":12,"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/posts\/1571\/revisions"}],"predecessor-version":[{"id":1595,"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/posts\/1571\/revisions\/1595"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/media\/1592"}],"wp:attachment":[{"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/media?parent=1571"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/categories?post=1571"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.evaisun.com\/wp-json\/wp\/v2\/tags?post=1571"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}